TurboPower Renewables as the first 100% Mexican full EPC (Engineering, Procurement and Construction) contractor of a wind farm in Mexico, has the proven experience of successfully performing wind farm projects.
TurboPower Renewables has the experience and resources necessary to direct, control and manage all key aspects to successfully construct a wind farm. The administration of engineering, costs, project management, safety & environmental management, community & governmental relations management, procurement of goods & services processes and contracting are manage in its entirety by TurboPower under an "Outcome- Responsibility to our client" principal; and our strategic alliance contractors and suppliers that participate in construction of the wind generator, geotechnical investigation, supply of equipment and materials, and site preparation (roads, foundations, cabling, erection, substation and transmission lines) are bound by the same principal.
Wind Farm Project Construction
The construction of a wind farm project usually consists of two groups of major activities:
- Substations, transmission interconnections and collection system.
- MV Cabling
- Transformers
- Auxiliary equipment
- Breakers
- Equipment, erection, electric and civil.
- Roads
- Foundations
- Wind generators and towers
- Turbine transformers
The construction process for wind farms is an intense components construction process, that requires an initial on-site investigation process, design and master plan preparation, early procurement of key equipment with long lead-times (i.e. wind generators, transformers, etc.) is critical. The process starts with the building of roads and assembly platforms for towers and generators, and continues with preparation - construction of generator foundations, construction of the control room, excavation and cabling of the collection system, construction of the substation, logistics, transportation and delivery of the wind generator, towers and blades, installation of the transformers, electric & communication connection of wind generators to the collection system, control room and substation.
The construction process culminates with the commissioning of each generator, followed by commissioning of the complete project. TurboPower Renewables strategy to successfully construct a wind farm is designed to optimize the capabilities and skills of its staff and strategic alliances working in synergy to assure that the project is produced with the highest safety and quality standards, and focused on finishing it in the period of time committed.